Adelaide, South Australia, Australia
The University of South Australia (UniSA) was a globally connected and engaged university with six main campuses across the state: City East, City West, Magill, Mawson Lakes, Mount Gambier and Whyalla. In January 2026, UniSA formally merged with the University of Adelaide to form Adelaide University, with the two institutions’ campuses, including these long-standing South Australian sites, now operating under the new university. Across the lead-up to the merger, Dewick & Associates provided O&M Manuals for services across UniSA’s various campuses, with projects ranging from minor room relocations and refurbishments through to major new buildings and department relocations, using the university’s own O&M manual template to capture each project’s scope, assets, maintenance requirements and operational functionality. Dewick & Associates also provided As-Installed Drawings for contractors as required to meet each project brief.

By Louise Gardner
Credit: This file is licensed under the Creative Commons Attribution-Share Alike 3.0 International license. Image data can be viewed here.
Region
Client
Completion Date
Project Value
The University of South Australia ran an ongoing programme of works across its six campuses — City East, City West, Magill, Mawson Lakes, Mount Gambier and Whyalla — ranging from minor room relocations and refurbishments to major new buildings and department relocations. A university environment with continuous, varied capital works needs an O&M documentation approach that can scale to each project’s size while remaining consistent with the institution’s own facilities management systems. Dewick & Associates was engaged across this programme to produce O&M Manuals using UniSA’s specific template, along with As-Installed Drawings where required by individual project briefs.
Producing O&M documentation across a multi-campus university programme means adapting to projects of vastly different scale — a minor room relocation has a very different documentation footprint to a major new building or department relocation — while keeping every manual consistent with UniSA’s own template so facilities staff across all six campuses could navigate the documentation in a familiar format. With the University of South Australia now part of the newly formed Adelaide University following the January 2026 merger, ongoing campus documentation also needs to reflect the transition to the new institution.
Dewick & Associates’ technical authors produced O&M Manuals using the university’s specific template across UniSA’s six campuses, capturing each project’s scope, assets, maintenance requirements and operational functionality, and provided As-Installed Drawings for contractors where required, alongside preventative maintenance schedules supporting the institution’s facilities management.
The project resulted in a consistent body of O&M documentation across UniSA’s campus works programme, giving the university’s facilities management team reliable, template-aligned records spanning projects of every scale ahead of its transition into the newly formed Adelaide University. For a no-obligation quote on O&M documentation for your next South Australian higher education project, contact Dewick & Associates.
The content in this case study has been informed by project documentation and client communication provided to Dewick & Associates during and following the completion of the project.
Note: Some content in this case study draws on a combination of sources rather than direct quotation. Where this is the case, contributing sources are acknowledged above rather than cited inline.
Detailing a structured strategy for monitoring, adjusting, and optimising building systems after handover, to ensure they operate efficiently, meet performance targets, and respond effectively to actual occupancy and usage conditions, including:
Outsource to our expert team so you can stay focused on delivering high-quality on-site construction
