Preston High Street Build to Rent Development

Preston, Victoria, Australia

Located within the Preston Junction Precinct, 6-34 High Street is an 18-storey Build to Rent (BTR) mixed-use development delivered in 2026. The $130 million development provides approximately 290 apartments, seven townhouses and more than 1,000m² of ground-floor retail space, alongside extensive resident amenities including wellness facilities, co-working areas, dining spaces and rooftop gardens. 

Designed with a focus on long-term residential living, the development incorporates sustainability initiatives including passive design features, rooftop solar PV and an average 7-star NatHERS energy rating. 

Dewick & Associates supported the project by preparing structured handover documentation to assist building owners, facilities teams, residents and future maintenance providers with the information required to safely operate and maintain the completed development.

By Louise Gardner

General Manager
Preston High Street Build-to-Rent development in Melbourne where Dewick & Associates delivered Mechanical and Electrical O&M Manuals and construction handover documentation.

Credit: AI-generated architectural representation / Preston Junction precinct

VIC, Australia

Region

Kapitol

Client

2026

Completion Date

$130 M

Project Value

Delivered by Kapitol Group for Barings Real Estate in partnership with Aware Super, 6-34 High Street, Preston is a significant Build-to-Rent development designed to support long-term residential living alongside retail and shared community facilities. As the asset transitioned from construction into operation, comprehensive handover documentation was required to support building management, maintenance teams, residents and future stakeholders.

Dewick supported the project through the development of a coordinated documentation suite comprising the Building Handover Manual, Building User Guide, Apartment User Guides and Townhouse User Guides. Each document serves a specific purpose in supporting the ongoing operation of the development, from technical asset management and preventative maintenance through to day-to-day use of residential spaces.

The Building Handover Manual provides a central repository of project information, including technical documentation, operation and maintenance manuals, warranties, certifications, drawings and maintenance requirements. The Building User Guide supports building owners and operational teams with practical information relating to shared facilities, building systems, safety procedures and sustainability features. The Apartment and Townhouse User Guides provide residents with clear guidance on the operation, care and maintenance of their homes, including installed services, safety requirements and warranty responsibilities. 

Together, these documents provide a structured information pathway from project completion through to ongoing building operation, helping ensure key information is accessible to the people responsible for maintaining, managing and using the development.

The successful operation of a large mixed-use residential development relies on accurate, accessible and coordinated building information.

The Preston High Street Build to Rent handover documentation needed to consolidate information from multiple disciplines, contractors and suppliers into a structured format suitable for ongoing use by asset managers, building operators, maintenance contractors and residents.

The project documentation needed to support compliance with the requirements of the National Construction Code (NCC) and the Victorian Building Regulations 2018, providing building owners and operational teams with the information required to safely operate, maintain and manage the completed asset.

Key challenges included:

  • Coordinating documentation from a diverse range of subcontractors, suppliers and consultants across architectural, structural, mechanical, electrical, hydraulic, fire and specialist building systems.
  • Ensuring operation and maintenance information, warranties, certifications and as-installed documentation were accurately captured and aligned with the completed installation.
  • Providing documentation that supported ongoing maintenance obligations, including essential services, safety requirements and preventative maintenance activities.
  • Structuring information for multiple end users, including asset managers, facilities teams, maintenance contractors, residents and building occupants.
  • Managing the transition from construction delivery into operational readiness while maintaining accurate records required throughout the building lifecycle.


With a significant volume of technical information required for ongoing operation, the challenge was not only collecting documentation, but ensuring it was reviewed, organised and delivered in a format that could be effectively used beyond practical completion.

Dewick implemented a structured documentation management process to coordinate, review and deliver the project’s complete handover information package. For a complex Build-to-Rent development of this scale, effective information management was critical to ensuring that asset owners, facilities teams and building users received accurate, accessible and operationally relevant documentation at completion.

Using nucleus, Dewick’s bespoke digital documentation portal, project information was centrally managed throughout the handover process. The platform enabled controlled collection, tracking and review of documentation from multiple subcontractors, suppliers and project stakeholders, providing visibility over submitted information, outstanding requirements and document status throughout delivery. 

The documentation workflow supported the collation and review of a significant volume of project information, including operation and maintenance manuals, warranties, certifications, manufacturer information, as-installed drawings and compliance records. Each submission was reviewed by Dewick’s technical team to ensure information was relevant to the completed installation, appropriately structured and suitable for ongoing asset management. 

The final documentation package was developed to support the requirements of the National Construction Code (NCC) and Victorian building compliance obligations by providing a clear record of installed systems, maintenance requirements, safety information and supporting certification required for ongoing building operation. The information was structured to assist building management teams in maintaining essential services, managing warranties and implementing preventative maintenance regimes throughout the building lifecycle.

The Building Handover Manual consolidated technical information across architectural elements, building services, fixtures, finishes and specialist systems, while the supporting Building User Guide, Apartment User Guides and Townhouse User Guides translated key operational requirements into practical information for building managers and occupants. 

Preventative maintenance requirements were incorporated through structured maintenance schedules and log sheets, outlining inspection frequencies and servicing requirements for critical building elements including waterproofing, façades, roofing, structural steel, landscaping and vertical transport systems. This information supports proactive asset management and helps maintain compliance, safety and performance outcomes beyond practical completion. 

By combining technical review, structured document control through nucleus and specialist construction documentation knowledge, Dewick delivered a coordinated handover package that supports the transition from construction completion into efficient building operation.

The completed documentation package provides Barings Real Estate and the operational team with a structured source of information to support the safe and efficient management of the Preston development.

By bringing together technical documentation, maintenance requirements, warranties, user guidance and operational information, the handover documents help establish a foundation for effective building management beyond practical completion.

The completed Building Handover Manual supports ongoing compliance obligations, preventative maintenance planning and informed decision-making throughout the building lifecycle.

For residents and building users, the supporting user guides provide clear information on building systems, safety procedures, maintenance responsibilities and sustainable operation, helping promote efficient use of the completed development.

Sources & References

The content in this case study has been informed by project documentation and client communication provided to Dewick & Associates during and following the completion of the project. Where external sources have contributed to our understanding of relevant standards or industry practice, these are listed below.

External Resources

Image Credit

AI-generated architectural representation of the Preston Junction precinct.

Note: Some content in this case study draws on a combination of sources rather than direct quotation. Where this is the case, contributing sources are acknowledged above rather than cited inline.

DO YOU NEED CONSTRUCTION Documentation FOR YOUR NEXT PROJECT?

Outsource to our expert team so you can stay focused on delivering high-quality on-site construction

Related Projects

Ready to Start
Your Project?

Make an Enquiry

More Featured Projects