Telford, UK
The Telford 6th Sixth Form Centre is a major education redevelopment located within the Station Quarter regeneration area in Telford, UK. The project involved the transformation and delivery of a modern sixth form facility designed to support advanced level education, flexible learning environments, and improved student outcomes.
Delivered by McPhillips Construction, the development forms part of a wider regeneration strategy for Telford town centre, repurposing and upgrading existing built assets into a contemporary educational environment. The project required a coordinated approach to construction delivery, building services integration, and regulatory compliance to support a smooth transition from construction into operational use.
To support project completion and handover requirements, Dewick & Associates was engaged by McPhillips to deliver a comprehensive suite of handover and compliance documentation, including Building Handover Manuals, Maintenance Matrices, Health & Safety Files, and the Regulation 38 Fire Safety Information File.

By Liana Ossai
Credit: The image has been generated by AI and depicts a sixth form college. It is not the actual site.
Region
Client
Completion Date
Project Value
McPhillips Construction is a well-established UK contractor delivering complex public sector, education, infrastructure, and commercial projects across the Midlands and wider United Kingdom. The company is recognised for its capability in managing technically demanding schemes with strong emphasis on programme delivery, quality assurance, and stakeholder coordination.
For the Telford 6th Sixth Form Centre project, McPhillips was responsible for delivering a high-quality education facility within a live regeneration environment. The project required strict compliance with statutory handover obligations and coordinated documentation across multiple building services disciplines.
Dewick & Associates was engaged to provide structured technical handover documentation to support building completion, regulatory compliance, and future facilities management operations.
Education facilities require a robust and fully coordinated handover process to ensure safe occupation, effective operation, and long-term asset performance. For the Telford 6th Sixth Form Centre, the project team needed to ensure that all statutory and operational documentation was fully aligned with UK regulatory requirements and suitable for long-term facilities management use.
Key challenges included:
The handover deliverables needed to move beyond compliance documentation alone, providing a practical operational toolkit for the building owner and estates team.
Dewick & Associates developed a structured suite of handover deliverables aligned with UK construction compliance requirements and best practice facilities management principles.
The scope of works included the preparation of comprehensive Building Handover Manuals, providing detailed operational documentation for all building systems. These manuals captured plant information, operating procedures, key system interfaces and the information required to support the ongoing management of the facility.
Detailed Maintenance Matrices were also developed, establishing structured maintenance schedules covering statutory obligations, planned preventative maintenance and manufacturer-recommended servicing requirements across the mechanical, electrical, hydraulic and fire services.
To support regulatory compliance, a complete Health & Safety File was compiled in accordance with the Construction (Design and Management) Regulations. This documentation consolidated as-built safety information, identified residual design risks and documented ongoing operational safety requirements for the completed facility.
A Regulation 38 Fire Safety Information Package was also prepared in line with UK Building Regulations. This provided the Responsible Person with the information necessary to manage fire safety systems effectively, undertake ongoing fire risk management and maintain compliance throughout the building’s operational life.
All documentation was developed in a coordinated format to ensure consistency, traceability, and ease of use for facilities management teams transitioning into occupation.
A key focus was ensuring information was not only compliant, but also operationally practical, enabling long-term asset management and safe building operation.
The completed handover documentation package provided McPhillips Construction and the project stakeholders with a fully coordinated and compliant suite of deliverables supporting practical completion and building occupation.
The documentation enabled:
For the client and end users, the deliverables established a robust operational foundation for the Telford 6th Sixth Form Centre, supporting safe occupation, effective maintenance planning, and long-term building performance.
The content in this case study has been informed by project documentation and client communication provided to Dewick & Associates during and following the completion of the project. Where external sources have contributed to our understanding of relevant standards or industry practice, these are listed below.
Note: Some content in this case study draws on a combination of sources rather than direct quotation. Where this is the case, contributing sources are acknowledged above rather than cited inline.
Direct access to a dedicated Client Coordinator who oversees the process and ensures deadlines are met.
Technical authoring and compilation of a CDM Reg 2015 compliant H&S Files to detail:
Detailed overview of the projects maintenance requirements for all trades, including
Compliant with Building Regulations 2010, compilation of fire safety documentation to minimise fire spread, maintenance of safety systems and execute safe evacuation, including: