Margaret River Senior High School Expansion

Margaret River, WA, Australia

The $30 million Margaret River Senior High School expansion, funded by the Western Australian Government, transformed the campus to accommodate growing enrolments, increasing capacity to 1,450 students across Years 7 to 12.

Delivered in four separable portions, the project includes new general learning facilities, science laboratories, health and physical education facilities, administration and student services, and farm sheds.

Dewick & Associates was engaged by MPM Group to produce the Mechanical Services Operation & Maintenance (O&M) Manuals, supporting a structured and compliant handover as construction progressed.

By Lauren Sahin

Client Coordinator: Australia East: NSW, QLD, VIC, TAS
Margaret River Senior High School Expansion Mechanical O&M Manuals, Western Australia

Image Credit: Image generated by Gemini AI, 2026.

WA, Australia

Region

MPM

Client

2020

Completion Date

$30 M

Project Value

MPM Group delivered the complete mechanical services installation across the staged development, incorporating Variable Refrigerant Flow (VRF) and split-system air conditioning, outside air ventilation, general exhaust systems, and specialist laboratory exhaust serving science facilities and IT spaces.

With multiple buildings reaching completion at different times, MPM Group required a documentation partner capable of delivering accurate Mechanical Services O&M Manuals for each separable portion. This staged approach ensured building operators received the information they needed as facilities became operational, rather than waiting until completion of the entire project.

Producing O&M documentation for a staged education project requires careful coordination between construction progress, commissioning and handover.

Each separable portion incorporated different mechanical systems, ranging from classroom air conditioning and staff amenities to specialist laboratory ventilation and sports facilities. The documentation therefore needed to accurately reflect each completed stage while maintaining consistency across the overall development.

Particular attention was required for the specialist ventilation systems serving science laboratories and fume cupboards, where correct operation and ongoing maintenance are critical to providing safe learning environments. The documentation also needed to support compliance with the National Construction Code (NCC), relevant Australian Standards, manufacturers’ maintenance requirements and the Western Australian Department of Education’s expectations for the ongoing operation and maintenance of school facilities.

Dewick & Associates’ Technical Writing team developed Mechanical Services O&M Manuals for each separable portion as construction reached completion.

Working from approved drawings, equipment schedules, commissioning information and manufacturers’ technical documentation, the manuals were authored to provide a complete operational record of the installed mechanical services, including:

  • VRF and split-system air conditioning.
  • Outside air and mechanical ventilation systems.
  • General exhaust systems.
  • Specialist laboratory and fume cupboard exhaust.
  • Equipment schedules and manufacturers’ literature.
  • Preventative maintenance schedules.
  • Operating procedures and maintenance guidance.


Each manual was subjected to Dewick & Associates’ quality assurance process to ensure the documentation was technically accurate, clearly structured and ready for practical use by facilities managers and maintenance contractors from day one.

By delivering Mechanical Services O&M Manuals progressively throughout construction, Dewick & Associates supported a smoother handover for each completed stage of the Margaret River Senior High School expansion.

The documentation provides the school’s facilities team with a clear, reliable reference for operating and maintaining the mechanical services that support classrooms, specialist teaching spaces and administration buildings. It also assists future maintenance contractors by providing accurate asset information and preventative maintenance requirements that promote system reliability, energy efficiency and long-term asset performance.

The staged delivery of the documentation aligned with the project’s construction programme, enabling each new facility to transition confidently into operation while supporting ongoing compliance with Australian building regulations and recognised industry standards for education facilities.

Sources & References

The content in this case study has been informed by project documentation and client communication provided to Dewick & Associates during and following the completion of the project. Where external sources have contributed to our understanding of relevant standards or industry practice, these are listed below.

Image Credit

Image generated by Gemini AI, 2026. Royalty free. Conceptual image based on the project location. 

Sources

Note: Some content in this case study draws on a combination of sources rather than direct quotation. Where this is the case, contributing sources are acknowledged above rather than cited inline.

DO YOU NEED CONSTRUCTION Documentation FOR YOUR NEXT PROJECT?

Outsource to our expert team so you can stay focused on delivering high-quality on-site construction