NCC 2025 introduces significant changes to the energy-efficiency requirements for Class 3 to 9 buildings.

The main changes affect J1V3 modelling, façade performance, HVAC efficiency, lighting controls and solar PV.

Adoption dates

NCC 2025 was published nationally on 1 May 2026, but each jurisdiction determines when it applies.

Jurisdiction NCC 2025 application
Victoria In effect from 1 May 2026.
Western Australia Adopted on 1 May 2026. NCC 2022 may be used until 30 April 2027, with NCC 2025 mandatory from 1 May 2027.
Australian Capital Territory Available from 1 May 2026 and generally mandatory from 1 May 2027 (subject to transitional provisions for certain existing applications).
New South Wales Adoption deferred until 1 May 2027.
Queensland Adoption deferred until 1 May 2027.
South Australia Building Code provisions take effect on 1 May 2027. NCC 2022 Amendment 2 applies until 30 April 2027.
Tasmania NCC 2025 applied from 1 May 2026 before NCC 2022 was reinstated on 5 June 2026. NCC 2025 is scheduled to apply again from 1 May 2027.
Northern Territory NCC 2025 has not been adopted. NCC 2022 and existing Northern Territory variations remain applicable.

Jurisdictional variations and project-specific transitional provisions may also apply. The building certifier should confirm the applicable NCC edition and Section J requirements in writing before façade or energy-efficiency advice is provided.

J1V3 Verification Method

NCC 2025 changes both the modelling inputs and the J1V3 compliance criteria.

Models must use projected 2050 weather data based on the RCP 8.5 climate scenario.

Rooms larger than 20 m² must generally include separate 4 m deep perimeter zones to prevent façade loads being averaged across larger internal zones.

PMV assessment remains applicable to Class 5 buildings. Other thermal comfort compliance pathways include prescribed room temperature limits and comparisons of the 98th percentile heating and cooling loads of individual zones against the reference building, subject to the applicable floor area and performance criteria.

Where proposed building services are included, the proposed building must achieve at least a 3% reduction in greenhouse gas emissions compared with the reference building. Matching the reference building is no longer sufficient.

The reference building must also include the minimum solar PV required by NCC 2025. Additional PV is not expressly excluded from the proposed model, but its ability to compensate for poor façade or services performance will be substantially reduced.

These changes reduce the scope for using J1V3 to resolve poorly performing façades late in design.

Building fabric

NCC 2025 generally tightens the wall-glazing requirements.

For Class 5 to 9b buildings in Adelaide, the maximum whole-of-façade U-Value reduces from 2.0 W/m²·K under NCC 2022 to 1.9 W/m²·K under NCC 2025.

For Class 3 hotels, Class 9c aged-care buildings and Class 9a ward areas in Adelaide, it reduces from 2.0 W/m²·K to 1.6 W/m²·K.

This is likely to require improved glazing, thermally broken framing, increased wall insulation or reduced glazing areas. Deemed-to-Satisfy façade assessments must also be undertaken separately for each storey.

Solar heat gain

The largest façade change relates to solar admittance, which accounts for glazing area, SHGC, orientation and external shading.

For Class 5 to 9b buildings in Adelaide, the general maximum solar admittance reduces from 0.13 to approximately 0.09.

For hotels, aged-care buildings and ward areas, it reduces from 0.10 to 0.06.

Projects may therefore require lower-SHGC glazing, more external shading or less glazing. Façades with high window-to-wall ratios may require a combination of these measures.

For example, an Adelaide office with a 60% window-to-wall ratio and 400 mm shading may require glazing with an SHGC of approximately 0.17 under NCC 2025, compared with approximately 0.25 under NCC 2022.

For a hotel with the same façade arrangement, the required SHGC may reduce from approximately 0.20 to 0.12. Glazing at this performance level can be difficult to procure and may have a noticeably dark appearance.

NCC 2025 allows vertical shading fins in Deemed-to-Satisfy calculations. However, highly glazed façades may require additional shading or reduced glazing areas rather than relying on improved glazing specifications alone.

Building sealing

The sealing requirements extend to more elements forming part of the building envelope, including roof lights, windows, doors and exhaust systems associated with unconditioned or non-habitable spaces. Exhaust fans may require self-closing dampers or equivalent sealing devices.

Air-conditioning and ventilation

Minimum efficiency requirements increase for a range of HVAC equipment.

HVAC equipment NCC 2022 NCC 2025
Air-cooled VRF over 30 kW EER/COP 2.9 EER/COP 3.4
500 kW air-cooled chiller IPLV 4.05 IPLV 5.1
1,000 kW water-cooled chiller IPLV 6.519 IPLV 10.4
Air-source heat-pump space heating No stated minimum COP 3.25

Mechanical equipment schedules and performance specifications will need to be checked against the NCC 2025 minimum values.

Projects using gas space heating must allow for future electrification, including electrical capacity, switchboard space and plant space. Where future air-source heat-pump heating is proposed, heating-water systems must generally accommodate design loads at temperatures below 50°C.

Other changes affect air-conditioning controls, fan requirements, economy-cycle thresholds and demand-controlled ventilation.

NCC 2025 references AS 1668.2:2024, which revises exhaust discharge separation requirements. Multiple exhaust outlets within a single 6 m radius are required to be treated as one discharge when determining airflow, potentially increasing separation distances to outside air intakes and openings. This may affect façade discharge arrangements in apartments, hotels and similar buildings.

Lighting controls

Spaces that are not regularly occupied will generally require motion-sensor or another form of demand-based lighting control. Regularly occupied spaces may use time-switch control.

Revised lighting operating profiles must also be used in reference-building calculations.

Solar PV

NCC 2025 introduces mandatory on-site solar PV for applicable Class 3 to 9 buildings. Compliance is based on either the available suitable roof area or a minimum peak output calculated from conditioned floor area.

Suitable roof area excludes plant areas, access routes, terraces and significantly shaded areas. Requirements may increase where gas is used for building services.

Green Star implications

NCC 2025 is likely to make the Green Star Buildings v1.1 Energy Use credit more difficult to achieve. Improved reference façade performance, mandatory PV and higher HVAC efficiencies reduce the benefits available from common energy-efficiency measures.

All-electric buildings may also receive less benefit where the reference building already uses electric heating. Projects should therefore assess the available performance margin early.

Project implications

For projects assessed under NCC 2025:

  • assess façade compliance during concept design;
  • test glazing performance before advising the client;
  • review hotels and aged-care buildings for thermally broken framing;
  • coordinate external shading and glazing proportions early;
  • do not assume J1V3 will resolve a difficult façade;
  • check HVAC selections against the revised minimum efficiencies;
  • allow for future electrification where gas heating is proposed; and
  • confirm the roof area available for solar PV.


NCC 2025 reduces the flexibility to resolve energy-efficiency compliance late in design, requiring earlier coordination of façade, mechanical and energy-modelling inputs.

The Role of Documentation

Meeting the requirements of NCC 2025 Section J extends beyond design and construction. Comprehensive project documentation helps capture the information required to support compliant building operation, maintenance and future asset management.

Dewick & Associates prepares coordinated building handover documentation for commercial projects, helping project teams deliver clear, organised information that supports owners, facilities managers and maintenance personnel long after practical completion.

References

Note: This article is intended as an educational resource only. It does not replace professional advice or project-specific documentation.
Commercial building illustrating NCC 2025 Section J energy efficiency requirements including building envelope, HVAC, lighting and rooftop solar PV.
About the Author
Richard Gardner
Mechanical Engineer
Richard Gardner

Technical Documentation Team

SHARE

Related Articles